Newington Emergency Works
- Project Type: Geotechnical Engineering, Buildings & Civils
- Client: Van Elle
- Location: Kent, UK
- Date: 2021
About this Project
A railway cutting close to Newington in Kent had failed causing the closure of the route between Sittingbourne and Gillingham.

Roles and Responsibility
ECSL were responsible for the design of a new retaining wall and slope remediation providing ground stabilisation to the failed cutting. ECSL also provided design of ground investigation and detailed design of a new king post retaining wall on the opposite cutting slope where ground monitoring identified further ground movements.
Services
- Retaining Wall Design
- Highways Design
- Structural Design
- BIM
Related Projects
Contact Us