Newington Emergency Works

  • Project Type: Geotechnical Engineering, Buildings & Civils
  • Client: Van Elle
  • Location: Kent, UK
  • Date: 2021

About this Project

A railway cutting close to Newington in Kent had failed causing the closure of the route between Sittingbourne and Gillingham.

Roles and Responsibility

ECSL were responsible for the design of a new retaining wall and slope remediation providing ground stabilisation to the failed cutting. ECSL also provided design of ground investigation and detailed design of a new king post retaining wall on the opposite cutting slope where ground monitoring identified further ground movements.

Services

  • Retaining Wall Design
  • Highways Design
  • Structural Design
  • BIM