Silvertown Car Park

  • Project Type: Buildings & Civils, Geotechnical, Bridges & Structures, M&E
  • Client: Richter Associates
  • Location: London, UK
  • Date: 2021

About this Project

Detailed Design Scope 3 involves plans to extend a new car park in Greenwich as a result of Silvertown Tunnel construction works.

The multi-level, multi-phased car park project encompasses 2000 new car parking spaces

Roles and Responsibility

ECSL were responsible for the highways and drainage design in accordance with the DMRB, writing the MCHW specification, swept path analysis and drainage modelling in accordance with SUDS

Services

  • Multi-disciplinary Design
  • Site Investigation
  • Lighting Ddesign
  • CCTV Design
  • Highways Design
  • Swept Path Analysis
  • Drainage Design

Related Projects

Contact Us

    Engineering Consultancy Services | Worldwide Expert Engineering Solutions