Welshpool and Llanfair Railway Inspections and Assessments

  • Project Type: Asset Management
  • Client: Welshpool and Llanfair Light Railway
  • Location: Welshpool, UK

About this Project

ECSL have been engaged to undertake the inspection and assessment of all railway bridges along the Welshpool and Llanfair light railway heritage line, originally constructed in 1903.

Our teams of bridge examiners and specialists in heritage bridge structures delivered the inspections utilizing a mixture of physical examination and photogrammetry, saving time on site and reducing the overall cost to the client. Using the photogrammetric survey data, the same engineers that undertook the exams went on to complete the structural assessments, reducing the data degradation that can sometimes occur between site and office based activities.

Roles and Responsibility

ECSL were responsible for leading both the site and office-based activities. Additionally, ECSL provided ad hoc asset management advice and training to WLLR staff during the course of the inspections

Services

  • Structure Assessment
  • Structure Inspection
  • Asset Management Advice

Related Projects

Contact Us

13 + 15 =

Engineering Consultancy Services | Worldwide Expert Engineering Solutions