Project Type:
Client:
Location:
Date:

National Grid is building a new cable tunnel, 32.5km in length, between Wimbledon and Crayford.
In Spring 2020 National Grid embarked upon a six-year, £1 billion project, to rewire South London via deep underground tunnels. This vital work will help keep Londoners connected to safe and reliable electricity supplies.
ECSL were responsible for the highways and drainage dsesign in accordance with the DMRB, writing the MCHW specification, swept path analysis and drainage modelling in accordance with SUDS
Need Any Help, Call Us 24/7 For Support
Derwent House, RTC Business Park, London Road, Derby, DE24 8UP