London Power Tunnels Drainage Design

  • Home
  • London Power Tunnels Drainage Design

 

London Power Tunnels Drainage Design

 
 

Project Type:

Buildings & Civils, Geotechnical, Bridges & Structures, M&E

 

Client:

Richter Associates

 

Location:

UK

 

Date:

2020 to 2021

About this Project

National Grid is building a new cable tunnel, 32.5km in length, between Wimbledon and Crayford.

In Spring 2020 National Grid embarked upon a six-year, £1 billion project, to rewire South London via deep underground tunnels. This vital work will help keep Londoners connected to safe and reliable electricity supplies.

Roles and Responsibility

ECSL were responsible for the highways and drainage dsesign in accordance with the DMRB, writing the MCHW specification, swept path analysis and drainage modelling in accordance with SUDS

Services

  • Highways Design
  • Drainage Design
 

Need Any Help?

Need Any Help, Call Us 24/7 For Support

+44 (0) 1159393617

dave.gent@engineeringcsl.com

Derwent House, RTC Business Park, London Road, Derby, DE24 8UP