Skelton Grange Cycle Path Feasibility Study

  • Home
  • Skelton Grange Cycle Path Feasibility Study
Skelton Grange Cycle Path Feasibility Study
 
 
 

Project Type:

Asset Management

 

Client:

Sustrans

 

Location:

Leeds, UK

 

Date:

2021

About this Project

Skelton Grange Road bridge in Leeds currently acts a bottleneck along one of the busiest cycle routes in the North East. Sustrans are looking to ease this bottleneck  by the introduction of a new cycle ramp or alternative route.

skelton-grange-cycle-path-feasibility-study-2

Roles and Responsibility

ECSL were commissioned to undertake a feasibility study looking at a new cycle-friendly access to Skelton Grange highway bridge. After undertaking a site visit, an options report was produced, which was then presented at a stakeholder engagement meeting.

Services

  • Feasibility Studies
  • Stakeholder Engagement

Need Any Help?

Need Any Help, Call Us 24/7 For Support

+44 (0) 1159393617

dave.gent@engineeringcsl.com

Derwent House, RTC Business Park, London Road, Derby, DE24 8UP