Project Type:
Client:
Location:
Date:
The project is to stabilise a railway embankment as part of the White Rose Station construction project; a new build railway station for the White Rose shopping centre, near Leeds, West Yorkshire.
ECSL were responsible for the design of a soil nail ground reinforcement system, these works included geotechnical assessment of the embankment to determine ground conditions and stability, design, specification and drawings of soil nails to be used and the production of a Design Risk Register in accordance with CDM 2015 Regulation 11.
Need Any Help, Call Us 24/7 For Support
Derwent House, RTC Business Park, London Road, Derby, DE24 8UP