Whorlton Bridge Remedial Works

  • Home
  • Whorlton Bridge Remedial Works

About this Project

Completed in 1831, Whorlton Bridge is Britain’s 2nd oldest suspension bridge relying on original chainwork after the union bridge over the River Tweed.

ECSL have been responsible for the design proposals and feasibility study to repair the 183 ft long suspension bridge.

Roles and Responsibility

ECSL were subcontracted to Taziker and have been responsible for all elements of the design and assessment works including providing site engineers to provide technical services during physical investigation and repair works

Project Type:

Asset Management

 

Client:

Taziker / Durham County Council

 

Location:

Durham, UK

 

Date:

June 2021 – August 2021

Services

  • Structure Assessment
  • Structure Inspection
  • Design of repairs
  • Temporary works design